佳能c2020出現(xiàn)E000074-0000怎么回事
更新時(shí)間:2024/11/20 12:12:14,view:561佳能打印機(jī)c2020蘇州佳能打印機(jī)售后服務(wù)中心客服熱線69616769,蘇州佳能售后電話,佳能售后網(wǎng)點(diǎn), 佳能C2020如何解決重影問題, 佳能c2020E000040-0, 佳能c2020廢粉倉(cāng)在哪里, 佳能c2020更換硒鼓一直預(yù)熱, 佳能C2020的廢粉倉(cāng)在哪兒,維修視頻
E000074 (轉(zhuǎn)印單元控制錯(cuò)誤)
Description
Error in the primary transfer disengagement control
At the primary transfer disengagement control, the sensor fails to detect although the specified time has passed.
Remedy
Error in the Primary Transfer Disengagement Solenoid, Error in the Primary Transfer Disengagement Switch, or the ITB Guide Rail error
1. Replace the ITB Unit
2. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Switch (SW01)
3. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Solenoid (SL01)
4. Check conduction of FU6 on the DC Controller PCB (UN09)
5. Replace the ITB Guide Rail
6. Replace the Main Drive
7. Replace the Fixing Drive
8. Replace the DC Controller PCB (UN09)佳能c2020出現(xiàn)E000074-0000怎么回事
佳能c2020usb無(wú)法識(shí)別 cy_pro 2021/3/15 轉(zhuǎn)印異常
Description
Error in the primary transfer disengagement control
At the primary transfer disengagement control, the sensor fails to detect although the specified time has passed.
Remedy
Error in the Primary Transfer Disengagement Solenoid, Error in the Primary Transfer Disengagement Switch, or the ITB Guide Rail error
1. Replace the ITB Unit
2. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Switch (SW01)
3. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Solenoid (SL01)
4. Check conduction of FU6 on the DC Controller PCB (UN09)
5. Replace the ITB Guide Rail
6. Replace the Main Drive
7. Replace the Fixing Drive
8. Replace the DC Controller PCB (UN09)佳能c2020出現(xiàn)E000074-0000怎么回事
佳能c2020usb無(wú)法識(shí)別 cy_pro 2021/3/15 轉(zhuǎn)印異常
熱門圖文